The Public Works Authority (Ashghal) announced the commencement of construction works for the second package of the Roads and Infrastructure Development Project in Izghawa and Al Thumaid, at a cost of about QAR 418 million. This package comes as part of Ashghal's plan to develop road and infrastructure networks and raise the efficiency of services in line with the urban and population growth in Izghawa and Al Thumaid.
In this context, Project Engineer at the Roads Projects Department at Ashghal, Eng. Tamader Al Mass, confirmed that the second package represents an important phase in completing the development of roads and infrastructure in the Izghawa and Al Thumaid. The project will provide integrated services to approximately 771 plots, in addition to schools, commercial centers, mosques and several service facilities and buildings. The package will also support population and urban growth, while providing the required infrastructure in accordance with the latest approved systems and technical standards.
The project includes the development of the road network and the implementation of various infrastructural facilities, ensuring integrated services, improving traffic flow and providing connectivity to major roads. It will also enhance traffic safety in the area, alongside the implementation of sustainable solutions that support the expansion of green spaces and help preserve environmental quality, Eng. Al Mass added.
The second package includes the development of approximately 23 km of roads, and 30 km of pedestrian and cycling paths. In addition to the installation of 589 street lighting poles and the provision of 2,730 parking spaces, while also providing road safety features, traffic signs and road markings.
Regarding infrastructure works, the package includes the construction of 23 km of rainwater drainage network and 6 km of treated sewage effluent (TSE) networks for irrigating green areas, covering approximately 171,650 square meters. In addition to the implementation of approximately 15 km of drainage networks.
The geographical scope of the second package extends across the area between Al Dawakhil Street to the east, National Day Ceremonial Road to the north, and Al Khor Road to the south covering a total area of approximately 600,000 square meters.
To ensure that construction works are carried out effectively and to minimize disturbance of residents and road users, the project has been divided into three geographical areas, with construction works being implemented sequentially in each zone while taking the necessary measures to maintain traffic flow. (QNA)
Source: QNA
--
About Qatar Living:
Since 2005, Qatar Living has been the trusted destination for everything Qatar. As the country's largest online community and marketplace, Qatar Living connects people with opportunities through jobs, property, vehicles, services, classifieds, events, local insights, and breaking news. Trusted by residents, newcomers, visitors, and businesses alike, Qatar Living brings Qatar together in one place.
Instagram - @qatarliving
X - @qatarliving
Facebook - Qatar Living
YouTube - qatarlivingofficial
Up Next

Qatar Airways Temporarily Suspends Flights to Riyadh and Dammam
Qatar Airways suspends flights to Riyadh and Dammam due to the situation in Saudi Arabia. Check updates and flight status on their website.
Oct 12,2026
Qatar Rail Wins “Worldwide Operator of the Year” at Global Light Rail Awards 2026
Qatar Rail wins Worldwide Operator of the Year at Global Light Rail Awards 2026, highlighting excellence in safety, service, and innovation.
Oct 12,2026
talabat Welcomes Moaiad Aqel as New Managing Director of Qatar to Lead Its Next Chapter of Growth
talabat appoints Moaiad Aqel as Managing Director of Qatar, driving growth and strengthening partnerships in the MENA region.
Oct 12,2026
Qatar Charity Opens Office in Egypt
Qatar Charity opens its new office in Cairo, marking a major step in humanitarian and development cooperation between Qatar and Egypt.
Oct 12,2026














